Manual›Reference›Memory & work
How do plans and goals work in Irene?
A plan is work that lasts longer than one chat: a Markdown file of checkbox steps that any agent, or you, can pick up and tick. Plans can roll up into goals, each with ordered checkpoints, so you see how this week's work leads to the thing you're aiming for. Plans record where you are; they don't run anything, and they don't nag. They live on your computer in ~/.irene/plans.
What makes it different
| what it does | the primitive behind it | what that buys you |
|---|---|---|
| One plan, every agent | Plans are files in one shared store, written by the Plans screen, the chronicle tool and the Coding agent's plan tool alike |
Start a plan with the main agent, continue it in Coding next week, and it's the same plan |
| Progress you can read | A plan's state comes from its ticks: none ticked is To do, some is In progress, all is Done. Blocked is set by hand | No status to keep in sync. The steps are the status |
| Goals as a chain | Goals hold ordered checkpoints; plans feed a checkpoint, or the goal itself, and a checkpoint can open the next plans | You see how today's plan moves the goal, not just a pile of tasks |
| Doesn't nag | Plans change only when someone writes to them. No reminders about age, no watching your folders or chats | A plan waits quietly until you or an agent picks it up |
| Irene proposes, you decide | Agents can suggest a goal and its checkpoints; only you can keep it | Your goals stay yours |
How it works
Plans
- A plan is a Markdown file of checkbox steps, with a short status sentence ("where this plan stands") and optionally a project, a goal and a date.
- Agents add at most 7 steps per write; you can write as many as you like. Why: the cap stops an agent padding a plan with guesses. A plan should hold steps someone actually knows.
- A date Irene sets is labelled "(estimate)". A date you set is your decision and has no label.
- A plan with no steps is "no steps yet", not Done.
- Edits are safe: each plan is locked while written, and an edit made from an out-of-date copy is refused rather than overwriting newer changes.
Goals and checkpoints
- A goal is something you're working toward, with checkpoints in order and a final diamond for the goal itself.
- A plan can feed one checkpoint (or the goal), and be opened by one checkpoint.
- When every plan feeding a checkpoint is done, the checkpoint can become a card on the board that watches for it. That's the only point where plans touch the board.
- Anyone, agent or you, can tick a goal or checkpoint. Dropping a goal keeps its plans and simply unlinks them.
Plans vs the board vs /goal
| is for | runs anything? | |
|---|---|---|
| a plan | what you're trying to achieve, and where it stands | no |
| a board card | one thing to do, possibly run by an agent at a set time | yes → Board |
/goal <condition> |
a chat command: keep working turn after turn until a judge agrees the condition is met | yes, in that chat only. /goal stop ends it |
A Chronicle goal and the /goal command are different things: one is a lasting planning record, the other a loop in one chat.
How agents use plans
- Steps within one chat go on the chat's task list. Multi-day work gets a plan. One thing for later becomes a card.
- Agents read a plan's next unticked step to pick up where things stand, tick steps as they finish them, and update the status sentence.
- The Coding agent keeps its plan linked to its chat, so after a restart it finds the same plan again.
Where you see it
Chronicle → Plans: - plans with no goal (and goal suggestions) under No goal yet; each goal as a band with its checkpoints; met goals and plans set aside under Archive - + Start a plan (or Start a plan on an empty page) - a suggestion reads Irene suggests a goal: with Keep and Drop - each plan card shows progress, its status sentence, and who last worked on it. "Working now" means an agent is on it, and you can open that agent's chat from the card - open a plan for Where this plan stands, its goal and links, its date, Blocked, Edit text (saves as you type), Set aside and Delete
The page checks for changes about every 2 seconds, so an agent's change appears shortly after it's made.
Approvals
- Keeping a goal is yours alone: there's no tool action an agent can use to keep one.
- Agents writing or editing plans go through the same approval as other Chronicle writes.
Privacy
Plans, goals and checkpoints are stored only on your computer: plan files and a small goals database in ~/.irene/plans.
What it costs
Plans themselves cost nothing: they're files. Agents writing them use normal usage for their turn.
Limits
- 7 new steps per agent write.
- A plan belongs to at most one goal, feeds at most one checkpoint, and is opened by at most one.
- Plans don't run or remind. Use the board or a schedule for that.
Related
- Chronicle · Board · Schedules & watches
- Main agent (
/goal) · Coding (plan)
[Ask Irene about this]
Updated